Thursday, August 26, 2010

Flooring

Got our Quinn-lite blocks, so they were laid just before the block on edge along all walls. Things are moving along a bit now. all ground floor waste pipes in place, water pipes including for American fridge are in place in two locations for flexibility.
All hardcore and blinding in, radon barrier down, and 100mm xtratherm insulation down with 25mm perimeter insulation against all walls, inc internal.
Just waiting for rad pipes to go down, then in goes the concrete.
Published with Blogger-droid v1.5.3.1